Powered by Smartsupp


Displaying items by tag: lqe

Tracked-resource sets

The tracked-resource set (TRS) specification allows a server to expose set of resources in a way that allows clients to discover the exact set of resources in the set, to track all additions to and removals from the set, and to track state changes to all resources in the set. This specification is HTTP-based and follows RESTful principles. It is suitable for dealing with large sets containing a large number of resources, as well as highly active resource sets that undergo continual change.

When project areas are enabled for configurations, for team members to see, use, create, or remove links across project areas, a Jazz administrator must install the Global Configuration Management (GCM) and Link Index Provider (LDX) applications. Use TRS v2.0 as a data source to create the linked lifecycle data index.

When project areas are not enabled for configurations, to ensure that Lifecycle Query Engine (LQE) can access the lifecycle data, you must configure it to work with Jazz™ Team Server (JTS) and then configure the lifecycle tools as data sources (TRS providers.)

Terminology:

Resource Set - an enumerable, finite, collection of Resources

Resource - web resource identified by URI; the Resource Set members

Server - party playing the role of Resource Set provider

Client - party playing the role of consumer; interacts with a Server to enumerate and track Resources in the Server’s Resource Set

Tracked Resource Set (TRS) - describes the set of Resources in a Resource Set, expressed as a Base and a Change Log

Base - portion of a Tracked Resource Set representation that lists member Resources

Change Log - portion of a Tracked Resource Set representation detailing a series of Change Events

Change Event - describes the addition, removal, or state change of a member Resource

 

What does rebase do ?

TRS providers are responsible for managing the base change log for their consumers. In theory, the base is established at the "beginning of time" and the change log continues to grow forever. A TRS provider may choose to periodically, or on some significant event, rebase or recalculate the base resources and prune the change log. The server should retain at least seven days of of the most recent change events in the change log, and set the cutoffEvent to the most recent retained change event to give clients time to catch up to the new base and change log.

The cutoffEvent property of the Base identifies the point in the Change Log at which processing of Change Events can be cut off because older changes are already covered by the new Base after the rebase operation.

In short, Rebase is a process that creates a new base for tracked resource set. This leads to truncating the changeLog to only contain last 7 days of changes while adding "cutoffEvent" property to the latest changeEvent.
The newly established base is now the actual one and new ChangeLog is based on changes on the members of the new base.

When is manual rebase mandatory ?

When a server rename procedure is performed, as a part of the post-rename steps, but before adding DNG TRS datasources back into LQE, one must perform full TRS 2.0 rebase in DNG.
TRS 2.0 rebase is also highly recommened after upgrading to newer DNG versions (base version, not iFix).


How to perform rebase ?


1, Open a web browser and navigate to your DNG frontend. Log in with the administrator privileges and continue to https://your.RMserver.com/rm/admin#action=com.ibm.rdm.fronting.server.web.trs .
2, Here you can see TRS status and rebase option. Click on the TRS 2.0 Full Rebase.
3, Wait for the operation to finish, the status of the rebase procedure is shown in the status windows which can be manually refreshed.
4, Once the rebase is done, you may continue with adding the LQE data sources and reindexing them.

 

If you need more detailed information, visit https://archive.open-services.net/wiki/core/TrackedResourceSet-2.0/

Jazz team platform has several options to create and generate various reports. In this article We will discuss two data sources that are used in these reports, difference between them and their pros and cons.

Image

Softacus AG

Löwenstrasse 20
8001 Zürich
Switzerland
E-Mail: info@softacus.com
Tel.: +41 43 5087081
Fax: +41 43 344 6075 

VAT: CHE-108.817.809 MWST
D-U-N-S® Number 486800618

Image

Softacus GmbH

Westendstrasse 28
60325 Frankfurt am Main
Germany
E-Mail: info@softacus.com
Tel.: +49 69 34876544
Fax: +49 69 5830 35709

VAT: DE301903892
D-U-N-S® Number 313482703

Image

Softacus s.r.o.

Křídlovická 351/47A
603 00 Brno
Czech Republic
E-Mail: info@softacus.com
Tel.: +420 530333482
Fax: +41 43 344 6075

VAT: CZ07286333
D-U-N-S® Number 496165108

Image

Softacus s.r.o.

Tatranské nám. 3
058 01 Poprad
Slovakia
E-Mail: info@softacus.com
Tel: +421 911 083 612
Fax: +41 43 344 6075

VAT: SK2121388148
D-U-N-S® Number  2121388148

Offcanvas

Cookie Policy